Bathroom Remodel Project – Week 4

Week 4 comes to a close with a lot of visible progress. The floor tile is mostly done as is much of the grout. The floor should be done on Monday, then they start tiling the shower. Here’s some photos of additional wall prep before the tile work started.

Next, they installed the coils for the heated floor and then began the tile work. The last day of their work (Saturday), they put cardboard on top of the tile to protect the fresh grouting, so the photo op was limited.