Bathroom Remodel Project – Week 8

Nearing the finish line. The painting is done, the countertop is on, the electrical is done, and the faucets are done. The tub had to be replaced as it was cracked, but we don’t really use it much, so it won’t hold things up. The shower glass should be in next week, and then we’re done. Now it’s time to read the 76 page manual that came with the high tech toilet seat.